Manufacturing Engineering Change Order

Change the Revision of an Assembly with the Engineering Change Order

The Manufacturing Engineering Change Order will keep track of all the changes made to a Bill of Materials.
Every modification is listed along with the reason for the change.
Once the changes have been approved a manager may push a single button and those changes will be applied to the Assembly.
The Software has a configuration to auto increment the revision or allow a manual revision.
The revision must be changed to complete the Engineering Change Order and update the Assembly Bill of Materials.
A Print out of the ECO may be generated for record keeping.


Engineering Change Order