This Inventory Software Displays Full Usage History of the searched part

   

 

  Check Inventory Stock
  View Bill of Materials
  Find Inventory Part
  Assembly Work Order
  Inventory Purchase
  Stockroom Requisition
  Print Barcode Labels
  Add Inventory Picture
  User Barcode Screen
  Purchase Supplier
  Purchase Report
 Orders from Stockroom
  Parts to reorder
  Inventory Sales Orders
  Sales Packing List
  Barcode Requisition
 Assembly Forecasting
  Upload Remote Barcode
  Print Inventory Report
  Software Password
  Sales Gross Profit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                          Manufacturing Engineering Change Order Software Screen

  Visual Inventory Control supports an Intuitive Manufacturing Engineering Change Order Software Screen.
  When the Engineering department is finished creating a Bill of materials and it is ready for production ,
  a Manufacturing Software user will assign a Revision Number and release the assembly to production.
  When a Bill of materials is released to production any changes will require an Engineering Change Order and it can no longer be changed in the assembly screen
  The Engineering Change Order lists all changes that need to be preformed to the Bill of Materials when there is a revision change.
  When all the changes have been reviewed by the proper staff, an engineering administrator may sign-off and process the Manufacturing Engineering Change Order.
  This will force all the changes to the Bill of materials and change the revision number to the new revision.
  The use of the Manufacturing Engineering Change Order is optional as long as the Assembly has NOT been released to production.